Employee proposing a swap
Understand the hour change before asking.
Enter both dated shifts and weekly totals, then review what each person gives and receives.
Can explain both hour deltas without calling them a fairness score.
Compare two shift durations and before/after weekly hours, check optional next-commitment overlaps, and record approval confirmations.
A quick decision brief for this specific tool
Both shift dates and strict 24-hour start/end times, each person’s weekly hours including the given shift, and optional next commitments
Shift durations, before/after weekly-hour arithmetic, optional clock gaps/overlaps, and user-recorded confirmation checks
Subtract the given shift and add the received shift; an earlier end crosses midnight while equal start/end is rejected
Choose your path
Compare direct before/after shift hours and reveal entered next-commitment overlaps without inventing universal burden, fairness, overtime, or approval rules.
Understand the hour change before asking.
Enter both dated shifts and weekly totals, then review what each person gives and receives.
Can explain both hour deltas without calling them a fairness score.
See obvious conflicts and missing checks.
Add next commitments and review qualification/policy confirmations.
Treats the result as arithmetic and completes authoritative checks elsewhere.
Avoid a 24-hour error for equal times or an incorrect negative duration.
Enter a cross-midnight shift, then try equal start/end.
Gets the correct overnight duration and a clear invalid state for ambiguous equal times.
This tool is part of these guided projects. Each project provides step-by-step instructions with checklists and all the tools you need in one place.
Tools you might need next
Calculate observed frequency shift from moving source or observer. Free doppler frequency shift tool for doppler, frequency, and more.
Calculate formant shift needed to preserve timbre when pitch shifting. Free formant frequency shift tool for formant, frequency, and more.
Calculate new frequency after pitch shift by semitones. Free pitch shift semitones tool for pitch and related calculations.
Times use a 24-hour clock. An end earlier than the start crosses midnight; equal start and end times are rejected instead of being assumed to mean 24 hours.
Duration = (End − Start + 24 hours) mod 24 hoursFor each person, the calculator subtracts the shift they give away and adds the shift they receive. The entered weekly total must already include the current shift.
After-swap week = Entered week − Given shift + Received shiftAn optional next commitment can reveal a clock overlap or gap. No universal rest, overtime, qualification, or fairness threshold is applied because those rules depend on the person, role, employer, agreement, and jurisdiction.
Updated: July 2026
Employee A gives up a night shift (10pm-6am) and gets a day shift (6am-2pm).
→ Both shifts are 8 hours, so weekly scheduled hours are unchanged by duration alone
Both work day shifts, but A's is on Saturday and B's is on Tuesday.
→ The tool reports duration and weekly-hour changes without assigning a weekend penalty
Both work the same evening shift, but B has a 90-minute commute to A's location.
→ Commute preference is discussed outside the arithmetic; no universal penalty is invented
Still verify schedule conflicts, role qualifications, employer policy, agreements, applicable rules, and approval
Discuss commute and personal constraints directly instead of applying a universal burden score
Review the calculated hours with the responsible manager or scheduler under the actual policy and applicable rules
Compare the direct schedule arithmetic for a proposed swap: each shift duration, each person's before/after weekly hours, and an optional clock gap to the next commitment. The tool does not score fairness, decide overtime or rest compliance, verify qualifications, or approve the swap.