Home sewer testing one material lot
Replace a generic shrink percentage with measured before/after marks.
Record specimen identity and treatment, enter both directional measurements, then inspect contraction, retained ratios and projected untreated scenario dimensions.
Can reproduce the signed record and keeps it tied to that specimen and treatment.
