Electrical designer auditing a partial schedule
Check arithmetic without a generic form silently assigning demand factors or a 240 V service assumption.
Name the schedule and multiplier sources, copy up to four complete VA lines and inspect connected versus multiplied totals.
Can trace every line while the complete adopted-code calculation and design decisions remain external.
