Build Pulley System
2 hoursBuild pulley tensioning system for 100m+ lines safely.
Field context
This workflow is part of 1 niche field
Learn slack longline walking from scratch with a clear step-by-step workflow, recommended tools, safety guidelines, and expert tips.
Build pulley tensioning system for 100m+ lines safely.
Tension line to sag target — typically 2-3% sag at midspan.
Walk line in segments falling safely to backup if leash used.
Log distance attempts and tension notes for progression.
Best practices for longline walking.
Main anchor failure at longline tension is catastrophic — backup mandatory.
Sun heats webbing dropping tension — retension midday.
Stop immediately if safety conditions change or equipment fails.